Reform of a hotel for the Melià group in Granada Reform of a hotel for the Melià group in Granada Reform of a hotel for the Melià group in Granada Reform of a hotel for the Melià group in Granada

 
17008
Reform of a hotel for the Melià group in Granada
2017
SEZTE SET

The property, located in the city of Granada, was built in 1965 and is destined to the hotel business. It is a compact building, with rectangular geometry, formed by basement floor and nine levels above ground level. It should be noted that access to the building on its main façade is formalized by means of an enclosure that extends along it.

Our work aims to inform of the possibility of opening a large inner courtyard of the building, as well as the installation of a swimming pool on the deck, as part of the integral reformation of the building.

Considering the geographical situation in which the building is located, in a high seismic risk location such as the city of Granada, it was necessary to evaluate the behavior of an accidental earthquake situation for the existing configuration, as well as for the modified situation, carrying out a quantitative and qualitative analysis of the results obtained in those studies.